{"id":164703,"date":"2026-04-27T08:00:00","date_gmt":"2026-04-27T06:00:00","guid":{"rendered":"https:\/\/www.startupbusiness.it\/?p=164703"},"modified":"2026-04-27T08:59:23","modified_gmt":"2026-04-27T06:59:23","slug":"gigawatts-and-megawatts-the-gap-between-reality-and-ambition","status":"publish","type":"post","link":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/","title":{"rendered":"Gigawatts and megawatts: the gap between reality and ambition"},"content":{"rendered":"\n<p>In the global energy and digital infrastructure sector, a growing gap is emerging between what is announced and what is actually delivered. Governments, utilities, investors and major technology companies regularly present projects measured in gigawatts (GW), a scale that conveys strategic ambition and industrial scale. However, when these projects move from the announcement phase to the operational phase, the capacity actually brought online is often much smaller and is measured in megawatts (MW).  <\/p>\n\n<p>This discrepancy is frequently misinterpreted. Some analysts attribute the gap to insufficient demand, funding constraints or technological barriers. In reality, the main constraint is of a different nature. The real bottleneck does not concern capital or demand, but the capacity for execution within complex infrastructure systems. With the rapid expansion of digital infrastructure linked to artificial intelligence, electricity grids, construction markets, regulatory systems and environmental resources must evolve simultaneously. The ability to synchronise these systems has become the decisive factor in determining whether an infrastructure project moves from announcement to implementation (CB Insights, 2026; SITRA, 2026).     <\/p>\n\n<p>Major infrastructure projects rarely fail because the business model does not work. More often, they run into difficulties because the coordination required to turn plans into operational systems breaks down well before construction begins. In the world of infrastructure, failure rarely lies in the financial models; it lies in the actual systems failing to progress as planned. Foresight research indicates ever more clearly that the technological transformation driven by artificial intelligence is simultaneously reshaping labour markets, energy systems and industrial infrastructure, increasing the complexity of cross-sectoral implementation (Millennium Project, 2025).   <\/p>\n\n<p>At the planning stage, many projects appear to be a sure thing. Development documents generally include access to energy, regulatory permits, land rights, financial commitments and grid connection agreements. When incorporated into project models, these elements make the transition from announcement to construction seem almost inevitable. However, what appears guaranteed at the planning stage often proves to be conditional once the project enters the implementation phase.   <\/p>\n\n<p>One of the most common misconceptions concerns electricity supply. Gaining access to the grid does not necessarily mean that electricity will be available when the infrastructure becomes operational. A connection authorisation guarantees the right to connect to the grid, but does not ensure that generation capacity or transmission infrastructure will be ready on schedule. As demand for electricity accelerates, driven largely by artificial intelligence workloads and digital infrastructure, bottlenecks in electricity grids are becoming increasingly apparent in advanced economies (International Energy Agency, 2026; Morgan Stanley, 2026). Artificial intelligence is no longer limited primarily by algorithms or hardware: it is increasingly constrained by the electricity infrastructure (Agostini, 2025a).    <\/p>\n\n<p>Time-related uncertainty makes the problem even more complex. Even when an increase in energy capacity is anticipated, developers often face long waiting lists for grid connections whilst utilities upgrade their transmission infrastructure. As a result, projects that appear viable in financial models can remain stalled for years whilst waiting for the energy infrastructure to catch up with digital demand (JLL, 2026). This dynamic gives rise to what some analysts call the \u2018AI energy paradox\u2019: computing capacity may grow faster than the energy systems needed to support it (Agostini, 2025c).   <\/p>\n\n<p>Permit processes introduce a further layer of uncertainty. Even when permits are granted, projects may face delays due to environmental constraints, water availability, land-use conflicts or opposition from local communities. With the expansion of digital infrastructure, policymakers are increasingly faced with systemic risks linked to energy demand, environmental pressure and infrastructure concentration (World Economic Forum, 2026).  <\/p>\n\n<p>The nature of financing also changes when projects move from the planning stage to construction. Capital commitments secured in the early stages of development do not automatically translate into bankable financing when cost escalations, supply chain disruptions or delays in completion times arise. Various analyses indicate that increasing capital intensity and technological uncertainty are redefining the economics of investment in digital infrastructure (McKinsey &amp; Company, 2026). Gigawatt-scale AI data centres are no longer simply IT projects: they are industrial megaprojects comparable to power stations or major transport infrastructure (Agostini, 2025d).   <\/p>\n\n<p>The consequence is structural. Projects rarely fail because of financial models; they fail when the actual systems fail to move forward in sequence. <\/p>\n\n<p>The development of large-scale infrastructure requires that various subsystems progress simultaneously. Energy generation and transmission must develop in tandem with regulatory processes, land access, water availability, engineering capacity, supply chains and financing structures. Infrastructure development is therefore essentially a matter of synchronisation: if any one of these subsystems falls out of step, the entire project sequence can collapse.  <\/p>\n\n<p>This challenge is particularly evident in the expansion of data centres dedicated to artificial intelligence. Machine learning workloads require enormous amounts of computing power, and the electricity consumption of digital infrastructure is set to rise rapidly over the next decade (International Energy Agency, 2026). At the same time, investment in data centre infrastructure is growing at an extraordinary rate. Some reports indicate that the global pipeline of new projects now exceeds $100 billion, reflecting the scale of investment fuelling the digital economy (ConstructConnect, 2026). Artificial intelligence infrastructure is progressively becoming a strategic industrial system that will influence global economic and technological competition (Agostini, 2025b).    <\/p>\n\n<p>Despite this investment boom, actual operational capacity often lags behind the announcements. The bottleneck is not funding, but systemic coordination. Energy infrastructure can be delayed. Grid connections can be postponed. Permitting processes can drag on. Construction costs can rise. When these delays occur simultaneously, the sequence of events required to complete the projects breaks down before the infrastructure becomes operational.      <\/p>\n\n<p>The expansion of digital infrastructure has also highlighted deeper physical dependencies. Data centres require not only electricity but also large quantities of water for their cooling systems. Large clusters can consume billions of litres of water per year, raising concerns about water availability in regions already subject to water stress (Li et al., 2023). This interaction between computational systems and natural resources is increasingly described as the energy\u2013AI nexus, that is, a system in which electricity, water and digital infrastructure become closely interdependent (OECD, 2026).   <\/p>\n\n<p>These interdependencies reflect a broader systemic reality: digital infrastructure is deeply integrated into the planet\u2019s physical systems. Energy systems, water resources, regulatory bodies and construction markets must evolve in tandem for infrastructure expansion to succeed. When these systems do not progress in parallel, projects come to a standstill.  <\/p>\n\n<p>This dynamic can be summarised as a simple systemic chain. The announced capacity depends on the enabling conditions falling into place. Electricity supply, permits, funding and construction must therefore progress simultaneously. When delays arise in any of these subsystems, the sequence breaks down. Power arrives too late or connections are delayed, construction schedules collapse and operational capacity fails to materialise.    <\/p>\n\n<p>The outcome is predictable: gigawatts remain gigawatts \u2013 on paper.<\/p>\n\n<p>For this reason, the main bottleneck in the expansion of modern infrastructure is neither demand nor the availability of capital. It is the ability to deliver. Building large-scale infrastructure requires the ability to coordinate electricity grids, regulatory systems, financial markets, supply chains and environmental resources simultaneously.  <\/p>\n\n<p>As governments and businesses seek to expand artificial intelligence infrastructure, renewable energy systems and digital networks simultaneously, this coordination challenge will become increasingly acute. Technological megatrends, geopolitical competition and the growing energy demands of AI are already reshaping the way infrastructure planning is approached globally (CB Insights, 2026; SITRA, 2026). <\/p>\n\n<p>Infrastructure planning can no longer be treated as a mere financial exercise. It must be understood as a challenge of systemic coordination. For policymakers, investors and business leaders, the lesson is clear. Infrastructure ambition is measured in gigawatts. Infrastructure reality is realised in megawatts. The difference between the two lies in execution. (photo by <a href=\"https:\/\/unsplash.com\/it\/@aiden_kepler?utm_source=unsplash&amp;utm_medium=referral&amp;utm_content=creditCopyText\">Leon <\/a>on <a href=\"https:\/\/unsplash.com\/it\/foto\/le-linee-elettriche-attraversano-il-lago-sotto-un-cielo-blu-lzWWnmN-vDY?utm_source=unsplash&amp;utm_medium=referral&amp;utm_content=creditCopyText\">Unsplash<\/a>)      <\/p>\n\n<p><strong><em>References<\/em><\/strong><\/p>\n\n<p><em>Agostini, M. (2025a). AI&#8217;s energy reckoning: How power became the new frontier of intelligence. Medium.   <a href=\"https:\/\/medium.com\/@tarifabeach\/ais-energy-reckoning-how-power-became-the-new-frontier-of-intelligence-98d4868e347b\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/medium.com\/@tarifabeach\/ais-energy-reckoning-how-power-became-the-new-frontier-of-intelligence-98d4868e347b<\/a><\/em><\/p>\n\n<p><em>Agostini, M. (2025b). The AI infrastructure race: How energy, capital, and power are reshaping global markets. Medium.   <a href=\"https:\/\/medium.com\/@tarifabeach\/the-ai-infrastructure-race-how-energy-capital-and-power-are-reshaping-global-markets-994c5aad05c2\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/medium.com\/@tarifabeach\/the-ai-infrastructure-race-how-energy-capital-and-power-are-reshaping-global-markets-994c5aad05c2<\/a><\/em><\/p>\n\n<p><em>Agostini, M. (2025c). The AI power paradox: Microsoft has the GPUs\u2014but not enough energy to use them. Medium.   <a href=\"https:\/\/medium.com\/@tarifabeach\/the-ai-power-paradox-microsoft-has-the-gpus-but-not-enough-energy-to-use-them-dbe58d28e424\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/medium.com\/@tarifabeach\/the-ai-power-paradox-microsoft-has-the-gpus-but-not-enough-energy-to-use-them-dbe58d28e424<\/a><\/em><\/p>\n\n<p><em>Agostini, M. (2025d). The real cost of a gigawatt data center in the AI era. Medium. <a href=\"https:\/\/medium.com\/@tarifabeach\/the-real-cost-of-a-gigawatt-data-center-in-the-ai-era-a0f9615585a3\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/medium.com\/@tarifabeach\/the-real-cost-of-a-gigawatt-data-center-in-the-ai-era-a0f9615585a3<\/a>  <\/em><\/p>\n\n<p><em>CB Insights. (2026). Tech trends 2026: 14 emerging trends to watch closely. <a href=\"https:\/\/www.cbinsights.com\/research\/report\/top-tech-trends-2026\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/www.cbinsights.com\/research\/report\/top-tech-trends-2026<\/a><\/em><\/p>\n\n<p><em>ConstructConnect. (2026). March 2026 data center report: Year begins with record construction starts. <a href=\"https:\/\/news.constructconnect.com\/march-2026-data-center-report\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/news.constructconnect.com\/march-2026-data-center-report<\/a><\/em><\/p>\n\n<p><em>International Energy Agency. (2026). Electricity 2026. <a href=\"https:\/\/www.iea.org\/reports\/electricity-2026\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/www.iea.org\/reports\/electricity-2026<\/a><\/em><\/p>\n\n<p>JLL. (2026).  <em>Navigating AI demand, power constraints and global opportunities.<\/em> <a href=\"https:\/\/www.jll.com\/en-us\/insights\/market-outlook\/data-center-outlook\">https:\/\/www.jll.com\/en-us\/insights\/market-outlook\/data-center-outlook<\/a><\/p>\n\n<p><em>Li, Y., Chen, Z., Zhang, L., &amp; Liu, J. (2023). Water consumption of data centers in the United States. Nature Sustainability, 6(7), 768\u2013775.   <a href=\"https:\/\/doi.org\/10.1038\/s41893-023-01034-6\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/doi.org\/10.1038\/s41893-023-01034-6\n <\/a><\/em><\/p>\n\n<p><em>McKinsey &amp; Company. (2026). Global tech agenda 2026. <a href=\"https:\/\/www.mckinsey.com\/capabilities\/mckinsey-technology\/our-insights\/mckinsey-global-tech-agenda-2026\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/www.mckinsey.com\/capabilities\/mckinsey-technology\/our-insights\/mckinsey-global-tech-agenda-2026<\/a><\/em><\/p>\n\n<p><em>Millennium Project. (2025). Work\/Technology 2050: Scenarios and actions. <a href=\"https:\/\/www.millennium-project.org\/publications\/worktechnology-2050\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/www.millennium-project.org\/publications\/worktechnology-2050<\/a><\/em><\/p>\n\n<p><em>Morgan Stanley. (2026). Energy markets race to solve the AI power bottleneck. <a href=\"https:\/\/www.morganstanley.com\/insights\/articles\/powering-ai-energy-market-outlook-2026\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/www.morganstanley.com\/insights\/articles\/powering-ai-energy-market-outlook-2026<\/a><\/em><\/p>\n\n<p><em>OECD. (2026). The weight of the cloud: The cost of AI for water. <a href=\"https:\/\/oecdcogito.blog\/2026\/03\/22\/the-weight-of-the-cloud-the-cost-of-ai-for-water\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/oecdcogito.blog\/2026\/03\/22\/the-weight-of-the-cloud-the-cost-of-ai-for-water<\/a><\/em><\/p>\n\n<p><em>SITRA. (2026). Megatrends 2026. <a href=\"https:\/\/www.sitra.fi\/en\/publication\/megatrends-2026\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/www.sitra.fi\/en\/publication\/megatrends-2026<\/a><\/em><\/p>\n\n<p><em>World Economic Forum. (2026). Global risks report 2026. <a href=\"https:\/\/reports.weforum.org\/docs\/WEF_Global_Risks_Report_2026.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">https:\/\/reports.weforum.org\/docs\/WEF_Global_Risks_Report_2026.pdf<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Projects aimed at generating the energy required to power the latest technologies suffer from a lack of structural coordination<\/p>\n","protected":false},"author":125,"featured_media":164702,"comment_status":"closed","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1346],"tags":[1324,1472,1865,1143],"companies":[],"journalist":[3234],"class_list":["post-164703","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-must-read","tag-artificial-intelligence-en","tag-energy-en","tag-industria-en","tag-investments","journalist-martino-agostini-en"],"featured_sizes_urls":{"thumbnail":{"src":"https:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","width":150,"height":84,"crop":false,"srcset":false,"alt":"megawatt of power"},"large":{"src":"https:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","width":1024,"height":575,"crop":false,"srcset":false,"alt":"megawatt of power"},"2048x2048":{"src":"https:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","width":1280,"height":719,"crop":false,"srcset":false,"alt":"megawatt of power"}},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gigawatts and megawatts: the gap between reality and ambition<\/title>\n<meta name=\"description\" content=\"Projects aimed at generating the energy required to power the latest technologies suffer from a lack of structural coordination\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gigawatts and megawatts: the gap between reality and ambition\" \/>\n<meta property=\"og:description\" content=\"Projects aimed at generating the energy required to power the latest technologies suffer from a lack of structural coordination\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/\" \/>\n<meta property=\"og:site_name\" content=\"Startupbusiness.it\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-27T06:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-27T06:59:23+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"719\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Emil Abirascid\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@emilabirascid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Emil Abirascid\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/\"},\"author\":{\"name\":\"Emil Abirascid\",\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/#\\\/schema\\\/person\\\/4e2760db2cb7ca47d635ea3d8d8486dd\"},\"headline\":\"Gigawatts and megawatts: the gap between reality and ambition\",\"datePublished\":\"2026-04-27T06:00:00+00:00\",\"dateModified\":\"2026-04-27T06:59:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/\"},\"wordCount\":1535,\"image\":{\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.startupbusiness.it\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/leon-lzWWnmN-vDY-unsplash.webp\",\"keywords\":[\"artificial intelligence\",\"energy\",\"industria\",\"investments\"],\"articleSection\":[\"Must Read\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/\",\"url\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/\",\"name\":\"Gigawatts and megawatts: the gap between reality and ambition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.startupbusiness.it\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/leon-lzWWnmN-vDY-unsplash.webp\",\"datePublished\":\"2026-04-27T06:00:00+00:00\",\"dateModified\":\"2026-04-27T06:59:23+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/#\\\/schema\\\/person\\\/4e2760db2cb7ca47d635ea3d8d8486dd\"},\"description\":\"Projects aimed at generating the energy required to power the latest technologies suffer from a lack of structural coordination\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\\\/164703\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.startupbusiness.it\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/leon-lzWWnmN-vDY-unsplash.webp\",\"contentUrl\":\"https:\\\/\\\/www.startupbusiness.it\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/leon-lzWWnmN-vDY-unsplash.webp\",\"width\":1280,\"height\":719,\"caption\":\"megawatt of power\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/\",\"name\":\"Startupbusiness.it\",\"description\":\"May the Force be with you!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/#\\\/schema\\\/person\\\/4e2760db2cb7ca47d635ea3d8d8486dd\",\"name\":\"Emil Abirascid\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/84e46190ac811c9c62650621ceca8f65c1e967d6b06e6352fe183145dba0d7e9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/84e46190ac811c9c62650621ceca8f65c1e967d6b06e6352fe183145dba0d7e9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/84e46190ac811c9c62650621ceca8f65c1e967d6b06e6352fe183145dba0d7e9?s=96&d=mm&r=g\",\"caption\":\"Emil Abirascid\"},\"description\":\"Emil Abirascid (\u30a8\u30df\u30fc\u30eb\u30fb\u30a2\u30d3\u30e9\u30b7\u30c3\u30c9), giornalista, fondatore e direttore di Startupbusiness, il primo magazine sull\u2019ecosistema startup e innovazione italiano. Co-fondatore di Designtech, l\u2019hub di innovazione che avvicina il mondo del design con quello della tecnologia. Advisor di Austrian Business Agency, Emil Banca, Fondazione Symbola, Fondazione Quadrans. Partecipa regolarmente a incontri, convegni, conferenze dedicate all\u2019ecosistema dell\u2019innovazione. E\u2019 stato co-organizzatore degli Italian Innovation Day and Series che si sono svolti dal dal 2016 al 2020 nelle citt\u00e0 di Tokyo in Giappone, Melbourne, Adelaide, Perth, Canberra in Australia e Singapore e co-organizzatore dell\u2019Italy India Innovation Day di AIICP 2021 e 2022. Ha curato il volume \u2018L\u2019innovazione che non ti aspetti. Contesti e visioni per l\u2019impresa\u2019 , l\u2019edizione italiana di \u2018La startup digitale, guida pratica step by step\u2019 e ha scritto la prefazione all\u2019edizione italiana de \u2018La quarta era\u2019 di Byron Reese, ed \u00e8 co-autore di \u2018Cosa e Dove: strategie digitali di ricerca del lavoro\u2019, tutti editi da FrancoAngeli. In passato \u00e8 stato curatore di StartupDigest Italy, coordinatore scientifico del Forum per la Ricerca della Provincia Autonoma di Trento, board member di TechChill Milano advisor di di ScaleIT , ha collaborato con Il Sole 24 Ore \u00e8 stato direttore di Innov\u2019azione, bimestrale edito da Apsti, ha collaborato con Corriere Innovazione ed \u00e8 stato presidente del comitato di selezione del Premio Marzotto e advisor di Cetif-Universit\u00e0 Cattolica Milano.\",\"sameAs\":[\"https:\\\/\\\/www.abirascid.com\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/emilabirascid\",\"https:\\\/\\\/x.com\\\/emilabirascid\"],\"url\":\"https:\\\/\\\/www.startupbusiness.it\\\/en\\\/author\\\/emil-abirascid\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gigawatts and megawatts: the gap between reality and ambition","description":"Projects aimed at generating the energy required to power the latest technologies suffer from a lack of structural coordination","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/","og_locale":"en_US","og_type":"article","og_title":"Gigawatts and megawatts: the gap between reality and ambition","og_description":"Projects aimed at generating the energy required to power the latest technologies suffer from a lack of structural coordination","og_url":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/","og_site_name":"Startupbusiness.it","article_published_time":"2026-04-27T06:00:00+00:00","article_modified_time":"2026-04-27T06:59:23+00:00","og_image":[{"width":1280,"height":719,"url":"http:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","type":"image\/webp"}],"author":"Emil Abirascid","twitter_card":"summary_large_image","twitter_creator":"@emilabirascid","twitter_misc":{"Written by":"Emil Abirascid","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/#article","isPartOf":{"@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/"},"author":{"name":"Emil Abirascid","@id":"https:\/\/www.startupbusiness.it\/en\/#\/schema\/person\/4e2760db2cb7ca47d635ea3d8d8486dd"},"headline":"Gigawatts and megawatts: the gap between reality and ambition","datePublished":"2026-04-27T06:00:00+00:00","dateModified":"2026-04-27T06:59:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/"},"wordCount":1535,"image":{"@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/#primaryimage"},"thumbnailUrl":"https:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","keywords":["artificial intelligence","energy","industria","investments"],"articleSection":["Must Read"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/","url":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/","name":"Gigawatts and megawatts: the gap between reality and ambition","isPartOf":{"@id":"https:\/\/www.startupbusiness.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/#primaryimage"},"image":{"@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/#primaryimage"},"thumbnailUrl":"https:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","datePublished":"2026-04-27T06:00:00+00:00","dateModified":"2026-04-27T06:59:23+00:00","author":{"@id":"https:\/\/www.startupbusiness.it\/en\/#\/schema\/person\/4e2760db2cb7ca47d635ea3d8d8486dd"},"description":"Projects aimed at generating the energy required to power the latest technologies suffer from a lack of structural coordination","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.startupbusiness.it\/en\/gigawatts-and-megawatts-the-gap-between-reality-and-ambition\/164703\/#primaryimage","url":"https:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","contentUrl":"https:\/\/www.startupbusiness.it\/wp-content\/uploads\/2026\/04\/leon-lzWWnmN-vDY-unsplash.webp","width":1280,"height":719,"caption":"megawatt of power"},{"@type":"WebSite","@id":"https:\/\/www.startupbusiness.it\/en\/#website","url":"https:\/\/www.startupbusiness.it\/en\/","name":"Startupbusiness.it","description":"May the Force be with you!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.startupbusiness.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.startupbusiness.it\/en\/#\/schema\/person\/4e2760db2cb7ca47d635ea3d8d8486dd","name":"Emil Abirascid","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/84e46190ac811c9c62650621ceca8f65c1e967d6b06e6352fe183145dba0d7e9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/84e46190ac811c9c62650621ceca8f65c1e967d6b06e6352fe183145dba0d7e9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/84e46190ac811c9c62650621ceca8f65c1e967d6b06e6352fe183145dba0d7e9?s=96&d=mm&r=g","caption":"Emil Abirascid"},"description":"Emil Abirascid (\u30a8\u30df\u30fc\u30eb\u30fb\u30a2\u30d3\u30e9\u30b7\u30c3\u30c9), giornalista, fondatore e direttore di Startupbusiness, il primo magazine sull\u2019ecosistema startup e innovazione italiano. Co-fondatore di Designtech, l\u2019hub di innovazione che avvicina il mondo del design con quello della tecnologia. Advisor di Austrian Business Agency, Emil Banca, Fondazione Symbola, Fondazione Quadrans. Partecipa regolarmente a incontri, convegni, conferenze dedicate all\u2019ecosistema dell\u2019innovazione. E\u2019 stato co-organizzatore degli Italian Innovation Day and Series che si sono svolti dal dal 2016 al 2020 nelle citt\u00e0 di Tokyo in Giappone, Melbourne, Adelaide, Perth, Canberra in Australia e Singapore e co-organizzatore dell\u2019Italy India Innovation Day di AIICP 2021 e 2022. Ha curato il volume \u2018L\u2019innovazione che non ti aspetti. Contesti e visioni per l\u2019impresa\u2019 , l\u2019edizione italiana di \u2018La startup digitale, guida pratica step by step\u2019 e ha scritto la prefazione all\u2019edizione italiana de \u2018La quarta era\u2019 di Byron Reese, ed \u00e8 co-autore di \u2018Cosa e Dove: strategie digitali di ricerca del lavoro\u2019, tutti editi da FrancoAngeli. In passato \u00e8 stato curatore di StartupDigest Italy, coordinatore scientifico del Forum per la Ricerca della Provincia Autonoma di Trento, board member di TechChill Milano advisor di di ScaleIT , ha collaborato con Il Sole 24 Ore \u00e8 stato direttore di Innov\u2019azione, bimestrale edito da Apsti, ha collaborato con Corriere Innovazione ed \u00e8 stato presidente del comitato di selezione del Premio Marzotto e advisor di Cetif-Universit\u00e0 Cattolica Milano.","sameAs":["https:\/\/www.abirascid.com\/","https:\/\/www.linkedin.com\/in\/emilabirascid","https:\/\/x.com\/emilabirascid"],"url":"https:\/\/www.startupbusiness.it\/en\/author\/emil-abirascid\/"}]}},"author_name":"Emil Abirascid","categories_names":["Must Read"],"_links":{"self":[{"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/posts\/164703","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/users\/125"}],"replies":[{"embeddable":true,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/comments?post=164703"}],"version-history":[{"count":2,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/posts\/164703\/revisions"}],"predecessor-version":[{"id":164705,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/posts\/164703\/revisions\/164705"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/media\/164702"}],"wp:attachment":[{"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/media?parent=164703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/categories?post=164703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/tags?post=164703"},{"taxonomy":"companies","embeddable":true,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/companies?post=164703"},{"taxonomy":"journalist","embeddable":true,"href":"https:\/\/www.startupbusiness.it\/en\/wp-json\/wp\/v2\/journalist?post=164703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}